Saturday a volunteer work crew assembled to prepare our transmitter site for the coming 3 phase power. Power line was hand trenched as well as a base prepared for the new transformer. The soil had rocks the size double basketballs and the crew dug in ferociously! Many thanks to Paul Bignall, Jim Columbus, Erik Houg, Jeff Poenix along with Jennifer and Zane, Big John and his dog Sarge, and Don Erlandson for spending a Saturday sweating in the dirt!!
Monday, September 15, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment